4:09:27 PM Readings
Hydro Plant
Water Elevation
Flow in Cubic Feet per Second (CFS)
Head
Tail
Net
Hydro
Waste
Total
DuBay
1,114.51
1,088.17
26.34
1,718
0
1,718
St. Point
1,086.98
1,070.15
16.83
2,291
0
2,291
Whiting
1,069.00
1,047.34
21.66
2,237
0
2,237
Biron
1,034.99
1,011.56
23.42
3,051
0
3,051
Wis. Rapids
1,011.07
980.56
30.51
3,310
0
3,310